Trench and Structural Collapse Rescue Program

Document FSSMS-PRG-16Stage 1Revision 5Version 0.3.3

Topic pages open on your jurisdiction, and requirements tables show its line. You can change this on any page.

1. Purpose and outcome statement

A cubic metre of soil weighs about as much as a car, and a trench that has collapsed once is more likely, not less, to collapse again. The people who die in trench rescues are often the rescuers: co-workers, bystanders and responders who went in to dig out a visible victim before the trench was made safe (NIOSH, n.d.-b). Structural collapse adds the same lesson at a larger scale, with secondary collapse, live utilities and void spaces that look survivable and are not. This program is working when no member of the department enters an unprotected trench deeper than the regulated depth for any reason, including to reach a victim; when the department has declared the level of trench and collapse rescue it provides and can field it with the shoring, monitoring and people it needs; when a collapse zone is set and kept at every structural collapse and every defensive fire; when the department knows which engineer it will call and when; and when every trench and collapse response ends with a review.

2. Applicability

Conditional unless the department provides trench or structural collapse rescue above awareness; it answers Profile Worksheet question 16 (01 Program Profile Worksheet). Awareness-level elements (5.1, 5.2, the recognition and deny-entry rules, the collapse zone rule in 5.8) apply to every department, because every department will arrive first at a trench collapse or a building collapse in its district whether or not it has adopted the service. Departments with urban search and rescue (USAR) or heavy urban search and rescue (HUSAR) obligations extend section 5.8 with their task force procedures.

Definitions

Consistent with 06 Glossary and Acronyms.

  • Collapse zone. The area around a structure, at least the height of the structure and generally one and a half times it, inside which no one operates when collapse is possible.
  • Excavation. Any cut, cavity, trench or depression in the earth formed by removing material.
  • Protective system. Shoring, bracing, sloping, benching or a trench cage that protects a person in an excavation from collapse.
  • Secondary collapse. Further movement of soil or structure after the initial collapse, often triggered by rescue activity, vibration, water or load.
  • Shoring. A structure of timber, pneumatic or hydraulic struts and panels that supports the walls of an excavation or a damaged building element.
  • Spoil pile. The excavated material placed beside the trench.
  • Trench. An excavation whose depth exceeds its width (the definition most provinces use; J18 Excavation and Trench).
  • Trench cage (trench box). An engineer-certified steel or aluminum structure placed in a trench to protect workers from wall collapse.
  • Void. A space within collapsed material that may hold a survivable position.
  • Psychological safety. The shared belief within a crew that it is safe to speak up, ask, admit error and challenge (Edmondson, 1999)DOI.

The core is generic. The depth trigger, slope rule, ladder distance, spoil distance, atmospheric rule and engineer triggers come from the applicable excavation regulation and differ by province and territory (J18 Excavation and Trench). Most provinces have no firefighter exemption for excavations: a rescue entry into a collapsed trench is work in an excavation, and the protective system the department installs is judged against the excavation rules.

Requirement Source Stage
Walls above the provincial depth trigger must be shored, braced or protected by a trench cage, or sloped to the provincial slope rule, or nobody enters within the wall height of the wall The applicable occupational health and safety regulation (J18 Excavation and Trench) S1
Ladder access within the provincial distance, extending above the top; spoil kept back the provincial distance; excavation kept free of water; atmospheric test before entry where hazardous substances may exist; powered equipment near the edge supported The applicable occupational health and safety regulation (J18 Excavation and Trench) S1
Shoring and bracing to an engineer-certified design or commercially manufactured and installed to the manufacturer’s specifications; trench cages engineer-certified with a nameplate and depth limit, inspected daily in use The applicable occupational health and safety regulation (J18 Excavation and Trench) S1
Organizational levels (awareness, operations, technician) for trench and excavation search and rescue, and for structural collapse search and rescue; hazard and risk assessment of the response area; training to the level declared (NFPA 2500, 2022) S1
Rescuer job performance requirements for trench rescue and structural collapse rescue (NFPA 1006, 2021, ch. 12 and ch. 6) S1
Technical rescue PPE (NFPA 1950, 2025) S2
Incident management, incident safety officer, accountability, collapse zones at risk events (NFPA 1550, 2024) S1
Soil classification and protective system selection conventions used in training (the Canadian regulations use a slope-or-support rule rather than soil classes) (OSHA, n.d.-b, 29 CFR 1926 Subpart P, App. A) as the training convention, not law in Canada S1
Written rescue procedures for trenches and excavations where the jurisdiction requires them The applicable occupational health and safety regulation (J18 Excavation and Trench) S1
Accreditation criteria this program answers: technical rescue deployment objectives by risk type and level, partner aid for gaps, annual program appraisal; hazard reporting and documented risk reduction (CPSE, 2019, criteria 5G.1, 5G.2, 11A.2, 11A.3) S2

4. Roles

Element Fire chief Deputy chief, operations Program manager, Technical Rescue HSO Training officer Rescue team lead Company officer Member On-call engineer Public works JOHSC
Service level declaration (trench; collapse) A R R C C C I I C
Trench rescue procedure I A R C C R C C C C
Collapse rescue procedure and USAR interface I A R C C R C C C C
Engineer on-call arrangement A R R C C R I
Pre-plans with public works and utilities I I A C R C R I
Shoring inventory and inspection I A C R C R I
Training and the annual soil evolution I A C C R R R R C I
Audit and verification I I C A/R C C

Deltas from 01 Roles and Responsibilities: an on-call structural engineer ({{Structural Engineer (on call)}}) is a standing consultant to the Technical Rescue team; public works provides excavation equipment, utility locates and site knowledge under a written arrangement.

5. Program elements

5.1 Service level declaration

Requirement. The department declares, separately for trench rescue and for structural collapse rescue, which level it provides (NFPA 2500, 2022): awareness (recognize, isolate, deny entry, call for resources, non-entry rescue of a lightly trapped person who can free themselves with a reach); operations (trench: install commercially manufactured protective systems in straight trenches to the manufacturer’s tables and conduct rescue inside them; collapse: light-frame and ordinary construction with basic shoring and surface and void search); technician (trench: intersecting and deep trenches, engineered systems; collapse: heavy construction, breaching, lifting, advanced shoring). Where the department is below technician, it names the mutual aid, provincial USAR or HUSAR capability it will call, with the call-out route and the expected time. Most municipal departments are operations for trench and awareness or operations for collapse; declaring more on paper than the roster can staff is the recurring failure pattern. Evidence. The signed declaration; the capability matrix (17.5). Stage. S1.

5.2 Triggers and thresholds

Requirement. Every member knows the numbers that decide whether a trench can be entered, and the numbers are in the procedure, not in someone’s head.

Minimum method. The generic rules; each province’s and territory’s values are on J18 Excavation and Trench:

  • Depth trigger. A trench deeper than the depth your jurisdiction sets (commonly 1.2 m; 1.4 m or 1.5 m in a few) is not entered unless a protective system is in place, the walls are sloped to your jurisdiction’s rule, or the trench is in sound stable rock. There is no rescue exception: the victim is reached by making the trench safe from outside first.
  • Wall-height rule. Nobody stands or works within a horizontal distance equal to the wall height of an unprotected wall, including on the lip.
  • Engineer triggers. An engineer’s written design or certification is required before entry where the trench is deeper than the depth at which your jurisdiction requires an engineered design (6 m in several jurisdictions, 3 m to 4.5 m in others, and some require an engineer for all shoring; J18 Excavation and Trench), where trenches intersect, where there are adjacent structures or utilities whose support is affected, where the soil has been previously disturbed, where sloping steeper than your jurisdiction’s rule is proposed, or where the shoring is not a commercially manufactured system installed to its tables. The on-call engineer is reached through dispatch.
  • Soil assessment is done by the rescue team lead using the training conventions (cohesive, granular, previously disturbed; layered; wet; vibration present) to choose the protective system and spacing from the manufacturer’s tabulated data. A soil that “looks stable” is treated as unstable; previously disturbed soil (every trench a backhoe just dug) is the worst case.

Evidence. The procedure; the trench size-up checklist (17.1) completed at every incident and drill. Stage. S1.

5.3 Trench rescue operations

Requirement. Trench rescue is run as a controlled, sequenced operation under SWP - Trench Rescue: make the trench safe, then make the rescue.

Minimum method.

  1. Scene control. Stop every engine, compressor and vehicle within the exclusion distance (this program’s default is 15 m or more; confirm locally) to remove vibration; move apparatus back; one way in and out; the public, the contractor’s crew and distraught co-workers kept back; a safety officer assigned.
  2. Utilities. Assume every line in the trench is live and charged; isolate with the utility or the contractor; no entry over an unisolated gas line.
  3. Atmosphere. Test before entry and continuously wherever sewer, fuel, decomposing material, engine exhaust or oxygen-displacing gas may exist, as Confined Space Program section 5.7 sets out; ventilate; no entry above the department’s action level.
  4. Spoil and surface loads. Spoil pile and every other load kept back the distance your jurisdiction sets from the lip (0.6 m to 1.2 m, depending on the jurisdiction); spoil that cannot be moved is cut back; ground pads laid around the lip to spread load and protect the edge.
  5. Protective system. Panels and shores installed from outside the trench, top down, to the manufacturer’s tabulated data for the soil and depth, in the order the procedure sets (the trench is never entered to place the first shore); supplemental shoring where the victim’s position needs it; de-shoring bottom up after the rescue.
  6. Ladders. A ladder in the protected zone, extending above the top, within the distance your jurisdiction sets of every member in the trench (commonly 8 m or 15 m, and as little as 3 m), and a second ladder where the work area is long.
  7. Victim access and packaging. Dig by hand and with vacuum or air tools around the victim; no mechanical digging within reach of the victim; protect the victim’s airway and body from further spoil; medical care in the trench by a member who is also protected; packaging for vertical lift.
  8. Secondary collapse watch. A member assigned to watch the walls, the spoil and the adjacent ground, with the authority to order everyone out.
  9. Engineer called at any trigger in 5.2.
  10. Recovery decisions. Where the victim is clearly deceased, the operation changes to a recovery with no acceptance of risk to members; the incident commander records the decision and its time.

Evidence. The procedure; incident records with the checklist; post-incident reviews. Stage. S1 at the declared level.

5.4 Protective systems and shoring equipment

Requirement. The department carries, inspects and tests the shoring it needs for its declared level, and every item is traceable.

Minimum method. A shoring equipment inventory (17.2) with each pneumatic or hydraulic strut by serial number, its rated range, its last manufacturer inspection and pressure test, its relief valve test; panels and sheeting by ID and condition; timber (grade stamped, stored dry, inspected before use, replaced when split or weathered); ground pads, cribbing, wedges; air supply (cylinders, regulators, hoses) inspected like SCBA air; vacuum and air-knife tools; trench cages, if carried, with the engineer’s nameplate and depth limit and a daily inspection record whenever in use. Annual manufacturer inspection and pressure test of pneumatic and hydraulic shores; monthly visual inspection of everything; post-use inspection and log. Manufacturer tabulated data carried on the rescue unit and used, never memory. Evidence. The inventory and inspection log; manufacturer certificates. Stage. S1 at operations.

5.5 Engineer involvement

Requirement. The department has a named on-call structural or geotechnical engineer ({{Structural Engineer (on call)}}) with a written arrangement (hours, contact route, fee basis, liability and insurance, what the engineer will and will not certify at a scene) and triggers for calling. The engineer is consulted in designing the department’s own trench training site, reviewing the shoring inventory’s tabulated data, and planning for collapse incidents. Evidence. The arrangement; call records. Stage. S1 for the arrangement; the department does not declare operations in trench without it.

5.6 Pre-plans and partners

Requirement. Trench and collapse incidents need resources the department does not own. Minimum method. Written arrangements with public works (excavators, operators, dewatering pumps, lighting, utility locates), the utilities (gas, electrical, water, telecommunications isolation), the municipality’s building official, local excavation and shoring contractors (equipment and tabulated data), the regional USAR or HUSAR task force, the provincial regulator’s notification route for a workplace collapse, and the coroner or medical examiner for recovery operations. A contact list on the rescue unit and in dispatch, reviewed every six months. Evidence. The arrangements; the contact list and its review date. Stage. S1.

5.7 Structural collapse rescue

Requirement. Structural collapse response is run at the declared level under written procedure with these controls, whatever the level:

  • Collapse zones set on arrival around every damaged structure and every exposure structure that could fail, held with tape, lights and a monitor, and expanded when conditions change. The collapse zone rule applies equally at defensive structure fires and is the single control that answers the collapse pattern in line-of-duty death investigations (NIOSH, 2003b, F2002-07).
  • Size-up of construction type, occupancy, collapse pattern (lean-to, V, pancake, cantilever, A-frame), utilities, hazardous materials, secondary collapse indicators, weather and time.
  • Utilities assumed live until the utility confirms isolation.
  • Building marking with a structure and hazard marking system the department adopts and trains (the national USAR and international search and rescue systems are the common conventions), applied at every entry point and kept current, so that every crew and every arriving task force reads the same marks.
  • Void search only by trained members, with shoring ahead of the search, atmospheric monitoring, accountability at the entry point, communication, a safety officer watching for secondary collapse, and a rescue plan for the searchers; no freelancing into voids.
  • Monitoring for secondary collapse by a dedicated member or instruments (transits, crack monitors) with an evacuation signal every member knows.
  • Heavy equipment coordinated by one person with a spotter, never working where members are inside.
  • Engineer called at every collapse where members will enter or work beneath damaged elements.
  • USAR and HUSAR interface. The department’s role before the task force arrives (size-up, zones, marking, utilities, surface rescue, staging, accountability) and after (support, logistics, integration into the task force’s structure) written into the procedure and exercised with the task force.
  • Accountability and rehab as Emergency Operations Safety Program and Firefighter Rehabilitation Program require; collapse incidents run for days and fatigue is a collapse risk.
  • Respiratory protection for dust (P100 at minimum; SCBA where the atmosphere is unknown) and decontamination after, under Decontamination and Contamination Control Program.

Evidence. The procedure; the collapse safety checklist (17.3); exercise records with the task force. Stage. S1 for zones, size-up, utilities, marking and the no-freelancing rule; S2 for void search and shoring at operations.

5.8 The collapse zone at every fire

Requirement. Because structural collapse kills firefighters at ordinary structure fires, not only at collapse incidents, the collapse zone rule in 5.7 is written into Emergency Operations Safety Program and applied at every defensive fire and every fire in a building showing collapse indicators, with the incident safety officer assigned early. This program owns the rule’s content; the operations program owns its application. Stage. S1.

6. Safety Differently in this program

(a) Work-as-done. Before the trench or collapse procedure is written or changed, the learning team describes with the crews: what the first-arriving engine actually does at a trench collapse with a contractor’s crew already digging and a victim talking; who stops the digging and how that conversation goes; how long it really takes the rescue unit to arrive and set the first panel, with the people who normally staff it; how the collapse zone is held at a defensive fire when the hydrant is inside it; how building marking is done now, if at all; what the crews do with an engineer’s advice they do not understand; and where they have improvised shoring in the past.

(b) Capacity and margins. This work goes right because the first officer holds the scene and does not let anyone in, because the rescue unit arrives with the right panels and the tabulated data, because the shores are tested and the air works, and because somebody watches the walls. The margin erodes with a visible, conscious victim and a family or co-workers already in the trench; with vibration from traffic and equipment nobody stopped; with rain, frost and thaw; with daytime volunteer response that puts the rescue unit 40 minutes out; with collapse incidents that run through the night; and with task forces that arrive to a scene nobody marked. The program protects the margin by making “make it safe, then make the rescue” the only sequence, by staffing a secondary collapse watch, by building the engineer and public works into dispatch, and by declaring only the level the roster can field.

(c) Just culture. A member who went to the edge of an unprotected trench to talk to the victim, or who started to dig because the victim asked, was answering a human pull every rescuer feels; the review asks what would have made holding back easier, not who to blame. The learning firewall applies to every debrief, learning team, near-miss report and review. Conduct concerns go to a separate process run by different people (Incident Investigation and Learning Program; The Human Factor, 2026a).

(d) Psychological safety. Anyone at a trench or collapse can say the hazard and the action: “Stop, everybody off the lip, the wall is moving.” The rescue group supervisor and the incident commander acknowledge, hold, and review it later. Members are expected to question the soil call, the shore spacing, the collapse zone size, or an order to enter a void; officers answer with the reason or change the plan. Leaders show it is safe by rehearsing the evacuation signal in every drill, by thanking the member who held the scene in the hot debrief, and by reporting their own near misses. A member’s concern about this program (a shore that leaked, a drill site that felt unsafe, a declaration the station cannot staff) goes to the company officer, the rescue team lead, the JOHSC consultant or the near-miss system and gets an answer within 15 days (section 12).

(e) Learning link. Every trench and collapse response, every annual soil evolution and every collapse zone set at a fire gets a Tier 1 After-Action Review. Any member entry into an unprotected trench, any secondary collapse with members inside the zone, any shoring failure, and any near miss with potential for death goes to Tier 2 Post-Incident Analysis. A death or critical injury is Tier 3 Independent Learning Review (The Human Factor, 2026a). Crew AAR questions: What did the victim and the people on site ask us to do, and what did we do first? When did we know the soil and the utilities, and how? What would have made it easier to hold everyone out until the first panel was in? Full method: Incident Investigation and Learning Program and Manual 02 - The Three Tiers and Event Triage.

7. Training and competency

Who What How often How verified
All operational members Trench and collapse awareness: recognize, isolate, deny entry, stop vibration, call resources, the depth and wall-height rules, non-entry rescue, collapse zones, building marking recognition Recruit; refresher every three years Written test and scenario
Rescue team (operations) Trench rescue job performance requirements at operations (NFPA 1006, 2021, ch. 12): soil assessment, protective system selection from tabulated data, panel and shore installation, ladders, atmosphere, victim access and packaging, de-shoring Initial; annual practical evolution in real soil with shoring installation documented; quarterly drills recommended Practical evaluation; evolution record
Rescue team (technician, if declared) Technician job performance requirements: intersecting and deep trenches, supplemental and engineered systems, heavy rescue Initial; annual Practical evaluation
Collapse team (operations or technician, if declared) Structural collapse job performance requirements at the declared level (NFPA 1006, 2021, ch. 6): size-up, marking, shoring classes (vertical, raker, laced post, sloped), void search, breaching, lifting, monitoring Initial; annual; joint exercise with the task force every two years Practical evaluation; exercise record
Rescue group supervisors and incident commanders Trench and collapse incident management; the engineer call; the recovery decision; task force integration Initial; every three years Scenario evaluation
Shoring equipment custodians Inspection, pressure testing procedure, tabulated data, air supply Initial; annual Assessment by the program manager
Instructors Qualified by knowledge, training and experience; the training site designed with the engineer Before instructing; reviewed every three years Instructor file

Training entries into any excavation on a training site follow the full excavation rules: the training trench is a workplace, and the exemption question does not arise.

8. Equipment, inspection, maintenance and testing

Item Inspection or test Interval Who Standard Record
Pneumatic and hydraulic shores Visual, function, relief valve Monthly; before and after use Rescue team Manufacturer Shoring inventory and inspection log (17.2)
Pneumatic and hydraulic shores Manufacturer inspection and pressure test Annual Manufacturer or authorized service Manufacturer Certificate
Panels, sheeting, strongbacks Visual: delamination, cracks, hardware Monthly; after use Rescue team Manufacturer Log
Timber shoring stock Grade stamp, splits, rot, storage dry Monthly; before use Rescue team Local timber shoring tables; engineer Log
Trench cages (if carried) Nameplate and depth limit; structure Daily when in use; monthly Competent person The applicable excavation regulation (J18 Excavation and Trench); engineer Log
Air supply for shores (cylinders, regulators, hoses) Visual; hydrostatic test of cylinders Monthly; cylinder test per TC cylinder requirements (CSA B339-25) Rescue team; cylinder service (CSA B339-25) SCBA-style cylinder record
Multi-gas detectors Bump; calibration Before use; manufacturer’s interval User; custodian See Confined Space Program Monitoring log
Ground pads, cribbing, wedges Visual Monthly Rescue team Department standard Log
Vacuum and air-knife tools, cutting and lifting tools Function; manufacturer service Monthly; manufacturer’s interval Rescue team; service Manufacturer Log
Rope, harnesses, hardware (vertical packaging and lift) Pre-use and post-use; log Every use User; competent person (NFPA 2500, 2022); Rope Rescue Program Form - Rope and Rescue Equipment Log
Building marking kit (paint, crayons, tape, lights) Contents Monthly Rescue team Department standard Log
Technical rescue PPE; P100 respirators Visual; fit test for respirators Before use; fit test on the interval in Respiratory Protection Program (the standard’s minimum is every two years) Member (NFPA 1950, 2025); (CSA Z94.4-18, cl. 9) Respiratory protection records

9. Safe work procedures this program owns

10. Records and forms

  • Trench rescue size-up and safety checklist (17.1); shoring equipment inventory and inspection log (17.2); collapse incident safety checklist (17.3); engineer and partner arrangements register (17.4); capability matrix (17.5); training and competency sign-off (17.6); quarterly indicator worksheet (17.7)
  • Retention: incident records and checklists for the period in 05 Document Control and Records and longer for any incident with injury; shoring certificates for the life of the item; training records for the member’s service plus the period in the records note.

11. Indicators

Indicator Type Definition Baseline Target
Service level matched to capacity Leading Hours per week the department can field the declared trench team (panels, shores, air, trained members) within its response target Measured over one month 100 percent or the declaration changes
Annual soil evolution Leading The evolution held, every responding station represented, shoring installed and documented First year Held every year
Team currency Leading Percentage of team members with current operations or technician evaluation At adoption 100 percent
Shoring test currency Leading Percentage of pneumatic and hydraulic shores with a manufacturer test within 12 months At adoption 100 percent
Engineer arrangement current Leading Signed, reviewed within 12 months, reachable through dispatch (tested quarterly) At adoption Yes
Collapse zone compliance Leading Percentage of defensive fires and collapse incidents where a collapse zone was established and recorded (from incident reports and ISO logs) First two quarters 100 percent
Size-up checklist use Leading Percentage of trench and collapse incidents and drills with a completed checklist First year 100 percent
Stop calls and good catches (psychological safety) Leading Stop-work and evacuation calls at trench and collapse incidents and drills reported and acknowledged, none followed by reprisal; members agreeing “I can call everyone off the lip and my officer will back me” First two quarters; first survey Rising; zero reprisal findings
Unprotected entries Lagging Member entries into an unprotected trench or an unshored void found in review Every incident reviewed Zero
Injuries and near misses Lagging Injuries and near misses at trench and collapse incidents and training per year Three-year history Near misses reported; injuries zero

12. Accountability and closed feedback loop

Element Who How
Owner Deputy chief, operations, through the program manager, Technical Rescue Accountable for the outcome in section 1; approves the declarations, procedures and the engineer arrangement
Doer Rescue team lead and team (procedures, drills, inventory, pre-plans); company officers (awareness controls, scene holding, collapse zones); training division (training, the annual evolution); the on-call engineer and public works under their arrangements Section 5
Verifier HSO (quarterly sample of inventory, checklists, currency); JOHSC (consulted on declarations and the training site; inspection of the rescue unit); internal audit (Checklist - Confined Space, Trench and Rope Rescue, annual); the annual evolution observed by the HSO or JOHSC consultant Findings logged to the register
Feedback Quarterly program update; indicator dashboard; change notices on any procedure, equipment or partner change; AAR after every response. A member’s concern: raised to the company officer, the rescue team lead, the JOHSC consultant or the near-miss system; logged in the team action log; answered to the member by the team lead within 15 days with the decision and the reason 06 Program Improvement Teams section 10
Closure Corrective Action Register: every deficiency (a failed shore, an expired test, a missed evolution, a collapse zone not set, an unprotected entry) logged within five working days with a priority on the department’s scale, P1 (Imminent) to P4 (Improvement), an owner and the due dates its priority sets; closure on evidence with verifier sign-off; extension and escalation as the priority scale sets; the JOHSC sees the open list every meeting Register rules

Loop test. A rescue team member reports on Monday that two pneumatic shores leaked down during Saturday’s drill and the relief valves have never been tested. By Friday both shores are tagged out, the item is in the register with the rescue team lead as owner, and the member has heard back. Within 30 days every shore has had its manufacturer inspection booked or completed, the inventory shows a test date for each, the inspection procedure adds the relief valve check, the change notice goes to every station that carries shores, and the quarterly update reports it closed with the test currency indicator attached.

13. Audit

Checklist: Checklist - Confined Space, Trench and Rope Rescue. The five questions first:

  1. Show me the separate declarations for trench and collapse, and the mutual aid route for whatever you do not provide.
  2. Show me the record of last year’s evolution in real soil and who attended.
  3. Pick a shore: show me its last manufacturer test and this month’s inspection.
  4. Who is your on-call engineer, when did dispatch last test the contact, and when did you last call them?
  5. Show me the last defensive fire’s ISO log: where was the collapse zone, and who held it? And when did a member last call everyone off a lip, and what happened to them?

Accreditation crosswalk. The declarations, capability matrix and annual appraisal evidence the technical rescue criterion; the hazard reporting and corrective action records evidence the occupational health and safety criterion (CPSE, 2019, criteria 5G.1, 5G.2, 11A.2, 11A.3).

14. Lessons learned built in

Generic patterns from trench and collapse fatality investigations (NIOSH, n.d.-b; NIOSH, 2003b, F2002-07) this program answers:

  • Civilian and responder entry into unprotected trenches to reach a victim; secondary collapse kills the rescuers. Controlled by 5.2 and 5.3 (no entry; protective system from outside first).
  • Spoil pile and apparatus too close to the lip; vibration from idling engines. Controlled by 5.3 steps 1 and 4.
  • “Clay that looks stable” and previously disturbed soil treated as safe. Controlled by 5.2 soil assessment rules.
  • No atmospheric monitoring in trenches with sewer or fuel exposure. Controlled by 5.3 step 3.
  • Structural collapse: freelancing into voids, no accountability, no engineer, no collapse zone for an uninvolved exposure structure; the investigation recommended establishing and monitoring a collapse zone and appointing an independent safety officer early (NIOSH, 2003b, F2002-07). Controlled by 5.7 and 5.8.
  • Task outside trained scope (the recurring Canadian theme in 05 Design Principles and Lessons Learned). Controlled by 5.1 and the capacity indicator.

15. Stage 1 minimum and cost note

Stage 1 minimum. Both declarations (5.1); the triggers and thresholds in the procedure (5.2); awareness training for every member; the collapse zone rule in operations (5.8); the engineer arrangement and the partner list (5.5, 5.6); if operations is declared for trench: the procedure (5.3), the shoring inventory with tested shores (5.4), the annual evolution (7); one learning-team session on the first ten minutes at a trench; the accountability loop (12).

Cost note. People: program manager and team about four hours a month; a half-day quarterly drill and one full-day annual evolution for the team; a custodian for the shoring inventory. Money: a trench operations cache (panels, strongbacks, pneumatic shores with air, ground pads, hand and vacuum tools) is a five-figure purchase plus annual manufacturer testing; the engineer’s retainer; the annual evolution site (often donated by public works or a contractor). Awareness-only departments need training, a size-up checklist and the mutual aid route.

16. Customize

Jurisdiction requirements

This chapter relies on the following legal requirements, which differ by province and territory. Check your jurisdiction’s section on each topic page before adopting it.

Topic What to check in your jurisdiction Page
Excavation and Trench How a trench is defined; the depth that triggers a protective system; the slope rule; ladder and spoil distances; water and atmospheric testing rules; trench cage and shoring requirements; when an engineer must design or certify; whether written trench and excavation rescue procedures are required; and whether any firefighter exemption applies (most jurisdictions have none) J18 Excavation and Trench

17. Implementation toolkit

17.1 Trench rescue size-up and safety checklist

Completed by the first officer and the rescue group supervisor; kept with the incident record.

# Item Done (time) By (role) Notes
1 Victims: number, location, buried depth, conscious, talking, visible
2 Everyone out of the trench and off the lip; contractor crew and bystanders held back
3 Vibration stopped: engines, compressors, traffic, equipment within the exclusion distance
4 Apparatus positioned back; one access route; staging set
5 Trench dimensions: depth, width, length, configuration (straight, L, T, X)
6 Soil: type, layered, wet, previously disturbed, frost; water in the trench
7 Utilities: identified, assumed live, isolation requested (gas, electrical, water, telecom)
8 Atmosphere tested at the lip and at depth (O2, LEL, CO, H2S, other); ventilation set
9 Spoil pile and surface loads back the required distance; ground pads placed
10 Engineer trigger present (depth, intersecting, adjacent structure, disturbed soil, non-standard shoring)? Engineer called (time)
11 Protective system selected from tabulated data (system, soil, depth, spacing); installed from outside, top down
12 Ladder(s) in the protected zone, extending above the top, within reach
13 Secondary collapse watch assigned; evacuation signal briefed
14 Safety officer assigned; accountability at the lip
15 Entry team, back-up, medical, rigging for lift assigned
16 Victim access method (hand, vacuum, air tools); airway and body protection
17 Packaging and lift plan
18 Recovery decision (if applicable): time, by whom
19 De-shoring bottom up; equipment accounted for
20 Regulator and owner notification (workplace incident); AAR scheduled

17.2 Shoring equipment inventory and inspection log

ID / serial Item (pneumatic strut, hydraulic strut, panel, strongback, timber, cage, pad, cribbing, air cylinder, tool) Rated range or capacity Manufacturer, model Date in service Last manufacturer test (date, result, certificate) Next test due Monthly inspection (date, result, by) Post-use inspection (date, incident or drill, result) Status

17.3 Collapse incident safety checklist

# Item Done (time) By (role) Notes
1 Collapse zone set around every damaged and exposure structure; marked, lit, monitored
2 Size-up: construction, occupancy, collapse pattern, secondary collapse indicators, weather
3 Utilities assumed live; isolation requested and confirmed (time)
4 Hazardous materials and atmosphere assessed; monitoring set
5 Incident safety officer assigned; accountability at every entry point
6 Building marking applied at entry points; search marks maintained
7 Engineer called (time); advice recorded
8 Task force or mutual aid requested (time); staging and integration plan
9 Surface victims removed; void search only by trained members with shoring, monitoring, communication, rescue plan
10 Secondary collapse monitor assigned; evacuation signal briefed and tested
11 Heavy equipment coordinator and spotter assigned; no members inside while equipment works
12 Respiratory protection for dust; decontamination plan
13 Rehab, rotation and fatigue plan for a protracted incident
14 Recovery decision (if applicable): time, by whom; coroner or medical examiner notified
15 AAR scheduled; Tier decision recorded

17.4 Engineer and partner arrangements register

Partner Role at trench and collapse incidents Contact route (dispatch) Arrangement (date, review date) Last contact test Last exercise together
{{Structural Engineer (on call)}} Design and certification at triggers; collapse advice
Public works Excavators, operators, pumps, lighting, locates
Gas utility Isolation
Electrical utility Isolation
Water and wastewater Isolation, dewatering
Building official Structural condition, orders
Shoring and excavation contractors Equipment, tabulated data
USAR / HUSAR task force Operations and technician collapse
Provincial regulator Workplace incident notification
Coroner or medical examiner Recovery operations

17.5 Capability matrix

District or station Trench level Collapse level Team members current Shoring cache (location, contents) Rescue-capable hours per week (measured) Mutual aid route and expected time

17.6 Training and competency sign-off

Member (role, ID) Awareness (date, expiry) Trench operations (date, expiry) Trench technician (date) Collapse level and date Annual evolution attended (date, role) Shoring custodian (date) Instructor (role) Result

17.7 Quarterly indicator worksheet

Quarter Rescue-capable hours (%) Team currency (%) Shoring test currency (%) Engineer contact tested (date) Collapse zone compliance (%) Checklist use (%) Evolution held (date) Stop calls and good catches (n, acknowledged n) Unprotected entries (n) Injuries and near misses (n) Open corrective actions (n, oldest days) Notes and asks
Q1
Q2
Q3
Q4

References

Center for Public Safety Excellence [CPSE]. (2019). Fire and emergency service self-assessment manual (10th ed.). Commission on Fire Accreditation International. https://cpse.org/wp-content/uploads/2019/08/10th-Edition-FESSAM-Strikethrough-Underline-v.4.pdf

CSA Group. (2018). CAN/CSA-Z94.4-18 (R2023), Selection, use, and care of respirators (5th ed.). https://www.csagroup.org/store/product/2426374/

CSA Group. (2025). CSA B339-25, Cylinders, spheres, and tubes for the transportation of dangerous goods (in force 2025-08-01 under the Transportation of Dangerous Goods Regulations, s. 5.10). https://tc.canada.ca/en/dangerous-goods/csa-b339

Edmondson, A. C. (1999). Psychological safety and learning behavior in work teams. Administrative Science Quarterly, 44(2), 350–383. doi:10.2307/2666999

National Fire Protection Association. (2021). NFPA 1006, Standard for technical rescue personnel professional qualifications. https://www.nfpa.org/codes-and-standards/nfpa-1006-standard-development/1006

National Fire Protection Association. (2022). NFPA 2500, Standard for operations and training for technical search and rescue incidents and life safety rope and equipment for emergency services (consolidates NFPA 1670, 1858 and 1983). https://www.nfpa.org/codes-and-standards/nfpa-2500-standard-development/2500

National Fire Protection Association. (2024). NFPA 1550, Standard for emergency responder health and safety (consolidates NFPA 1500, 1521 and 1561). https://www.nfpa.org/codes-and-standards/nfpa-1550-standard-development/1550

National Fire Protection Association. (2025). NFPA 1950, Standard on personal protective equipment for technical rescue incidents, emergency medical operations, and wildland and urban interface firefighting (consolidates NFPA 1951, 1977 and 1999). https://www.nfpa.org/codes-and-standards/nfpa-1950-standard-development/1950

National Institute for Occupational Safety and Health [NIOSH]. (n.d.-b). Fire Fighter Fatality Investigation and Prevention Program [Program website and investigation reports]. Centers for Disease Control and Prevention. https://www.cdc.gov/niosh/firefighters/fffipp/index.html

National Institute for Occupational Safety and Health [NIOSH]. (2003b). One career fire fighter dies and another is injured after partial structural collapse: Texas (Fire Fighter Fatality Investigation Report F2002-07). Centers for Disease Control and Prevention. https://stacks.cdc.gov/view/cdc/163849

Occupational Safety and Health Administration [OSHA]. (n.d.-b). Excavations: Soil classification (29 C.F.R. Part 1926, Subpart P, Appendix A). U.S. Department of Labor. https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926SubpartPAppA

The Human Factor. (2026a). After the Call, Manual 02: The three tiers and event triage [Unpublished manuscript].

© 2026 The Human Factor · Licensed under CC BY-NC-SA 4.0 with the Adopting Agency Grant

General information only, not legal, medical or other professional advice. Verify every requirement against the current official text of the law, standards and manufacturer instructions that apply to you. Obtain your own legal review and consult your joint health and safety committee before adopting anything. You adopt, adapt, implement and rely on this material entirely at your own risk and on your own responsibility. Full terms: Terms of Use, thehumanfactor.ca.

Copyright, licence and legal notices

Connections

Pages linked to and from this page.