Form - Quarterly Program Progress Update

Document FSSMS-FRM-10Stage 1Revision 2Version 0.3.3

Topic pages open on your jurisdiction, and requirements tables show its line. You can change this on any page.

How to use

Completed by the team lead for every Program Improvement Team within 15 days of quarter end (July 15, October 15, January 15; the fourth quarter is folded into the annual appraisal) and sent to the program manager, the senior leadership team and the JOHSC for information (06 Program Improvement Teams section 10). Two to four pages. The CFAI model expects at least quarterly internal reporting on the delivery system and prioritized remedial actions (CPSE, 2019, criterion 2D.2); ISO 45001 expects monitoring results to be evaluated and communicated (ISO 45001:2018, cl. 9.1). Write in the past tense for what happened, the future tense for what is planned, and status tags in capitals at the start of each milestone line: COMPLETED, IN PROGRESS, ONGOING, ON HOLD, CANCELLED.

Part A: Header

Field Entry
Program and team
Quarter and fiscal year {{Quarter}} {{Year}}
Program manager (role) / Team lead (role)
Date submitted
Outcome statement (from the charter, unchanged unless the appraisal changed it)

Part B: The quarter in five lines

What moved, what did not, what the team learned, what the team needs, what members will notice.

Part C: Indicators for the quarter

Indicator (from the program module section 10) Baseline Target This quarter Last quarter Same quarter last year By district or zone (exceptions only) Career / volunteer split Note
Leading indicator 1
Leading indicator 2
Lagging indicator 1
Lagging indicator 2
Psychological-safety measure for this program (near-miss and good-catch reports; stop-work calls reviewed; concerns raised and answered)

Trends, outliers and events that need a detailed review (two or three sentences each):

Part D: Milestones

Work plan action Owner (role) Due Status tag Note

Planned for next quarter:

Action Owner (role) Due

Part E: Corrective actions (from the register, this program’s slice)

Opened this quarter (count by priority, P1 to P4) Closed this quarter (count by priority) Overdue at quarter end (IDs, priority, age, escalation level) P4 (Improvement) plans presented, which fall due at this update (IDs) Effectiveness checks done and results

Part F: Learning and engagement

Field Entry
Learning-team sessions held (task, number of participants by role, date) and what they found (conditions, not people)
Procedures or job aids changed because of them (document numbers, change notice dates)
Training delivered (course, sessions, attendance career and volunteer, assessed by)
Research, literature reviews, field trials (status, next step)
Equipment reviewed, trialled, recommended, accepted (Equipment Standards team references)
JOHSC consultations this quarter (date, item, outcome) and standing consultant attendance
Concerns raised by members to the team, and the date each was answered

Part G: Risks and asks

Risk or constraint Effect on the program Mitigation in place Ask of the senior team (decision, resource, date needed)

Part H: Member-facing summary (five lines, copied to the station briefing)

What changed this quarter and why; what is coming; who to talk to.

Part I: Sign-off

Role Confirmation Date
Team lead (prepared)
Program manager (reviewed)
Received by senior leadership team (date)
Received by JOHSC (meeting date)

Fields

Field Type Required Who completes
Program and team; quarter; roles; date; outcome statement Text; pick list; date Yes Team lead
Five-line summary Text Yes Team lead
Indicator rows Numbers with baseline, target, current, prior, prior year, splits Every indicator in the program module; at least one psychological-safety measure Team lead from the HSO’s data
Trends and events needing review Text Yes (may be “none”) Team lead
Milestones (action, owner, due, status tag, note) Repeating group One per work plan action Team lead
Next quarter actions Repeating group Yes Team lead
Register slice Counts by priority and IDs Yes Team lead from the register
Learning and engagement fields Text Yes (may be “none” with reason) Team lead
Risks and asks Repeating group Yes (may be “none”) Program manager
Member-facing summary Text, five lines Yes Team lead
Sign-off Roles, dates Yes Team lead; program manager; recipients

References

Center for Public Safety Excellence [CPSE]. (2019). Fire and emergency service self-assessment manual (10th ed.). Commission on Fire Accreditation International. https://cpse.org/wp-content/uploads/2019/08/10th-Edition-FESSAM-Strikethrough-Underline-v.4.pdf

International Organization for Standardization. (2018). ISO 45001:2018, Occupational health and safety management systems: Requirements with guidance for use. https://www.iso.org/standard/63787.html

© 2026 The Human Factor · Licensed under CC BY-NC-SA 4.0 with the Adopting Agency Grant

General information only, not legal, medical or other professional advice. Verify every requirement against the current official text of the law, standards and manufacturer instructions that apply to you. Obtain your own legal review and consult your joint health and safety committee before adopting anything. You adopt, adapt, implement and rely on this material entirely at your own risk and on your own responsibility. Full terms: Terms of Use, thehumanfactor.ca.

Copyright, licence and legal notices

Connections

Pages linked to and from this page.